Product Detail
Essential details
Four Charger source priority options:
- Utility first: Utility will charge battery as first priority.Solar energy will charge battery only when utility power is not available.
- Solar first: Solar energy will charge battery as first priority.Utility will charge battery only when solar energy is not available.
- Solar and Utility (default): Solar energy and utility will charge battery at the same time.
- Only Solar: Solar energy will be the only charger source no matter utility is available or not.
Three output source priority options:
Utility first (default): Utility will provide power to the loads as first priority.Solar and battery energy will provide power to the loads only when utility power is not available.
Solar first: Solar energy provides power to the loads as first priority.If solar energy is not sufficient to power all connected loads, battery energy will supply power the loads at the same time.Utility provides power to the loads only when any one condition happens:
– Solar energy is not available
– Battery voltage drops to low-level warning voltage or the setting point in program 12.
SBU priority: Solar energy provides power to the loads as first priority. If solar energy is not sufficient to power all connected loads, battery energy will supply power to the loads at the same time.Utility provides power to the loads only when battery voltage drops to either low-level warning voltage or the setting point in program 12.