Product Detail
Essential details
Three operation modes:
Grid-tie with backup: PV power can feed back to grid,provide power to the load and charge battery.There are four options available in this mode: Grid-tie with backup I, II, III and IV. In this mode, users can configure PV power supply priority,charging source priority and load supply source priority However,when Grid-tie with backup TV option is selected in PV energy supply priority, the inverter is only operating between two working logics based on defined peak time and off-peak time of electricity. Only peak time and off-peak time of electricity are able to set up to optimize electricity usage.
Grid-Tie: PV power can only feed back to grid.
Off-Grid: PV power can only provide power to the load and charge battery but can’t feed back to grid.
Battery charging source options:
1. PV and Grid (Default): It’s allowed to charge battery from PV power first. If it’s not sufficient, grid will chargebattery.
2. PV only: It is only allow PV power to charge battery.
3. None
Load supply source options:
When PV power is available:
1.1st PV,2nd Battery,3rd Grid. PV power will provide power to the load first. If it’s not sufficient, battery will provide power to the load. When battery is running out power or not available, grid will back up the load.
2.1st PV,2nd Grid,3rd Battery .PV power will provide power to the load first. If it’s not sufficient, grid will provide power to the load. If grid is not available at the same time, battery power will back up the load.
When PV power is not available:
1.1st Grid,2nd Battery: Grid will provide power to the load first. If grid is not available,battery will provide power backup.
2.1s Battery, 2nd Grid: Battery will provide power to the load first. If battery is running out power, grid will back up the load.